Recent News

LEADFRP Green Energy Fiberglass Wind Turbine Blades-Challenges and opportunities coexist the era of large base 2.0

In 2009, the construction of the 10 million-kilowatt wind power base in Jiuquan, Gansu took the lead in starting construction, which kicked off the era of the 1.0 era of China’s wind power base. After a lapse of ten years, the large base has once again become the focus of China’s wind power development. In 2019, with the implementation of the first large-scale affordable base-China Guangdong Nuclear Power Xing’an League 3 million kilowatts old revolutionary base area wind power poverty alleviation project (hereinafter referred to as the “Xing’an League Project”), China’s wind power base development officially entered 2.0 era. Different from the traditional large bases, the development of large bases in the 2.0 era pays more attention to the strict control of the cost of electricity, which requires the project to achieve accurate calculation and design of the entire chain and no dead ends in the early stage of development to ensure Realize stable and predictable income for a 20-year operating cycle under parity. Email: sales8@leadfrp.com; Web: www.leadfrp.com